Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

TITANIUM SANDS LIMITED Investor Presentation 2006

Jul 18, 2006

65956_rns_2006-07-18_e4d9115b-543c-4911-81de-a2b97e37db32.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

Roderda Smith B. Comm. C.A. F. Fin. Managing Director Precious Metals Australia Limited

Windimurra Vanadium Mine Mid West Resources Forum June 2006

  • Windimurra project description $\mathcal{L}_{\mathbb{R}^+}$
  • Windimurra history ang.
    Sinta
  • Current status $\mathbb{Z}_2^{m}$
  • Geology and resource hady.
  • Redevelopment schedule em
    Sa
  • Competitive advantages $\mathbb{Z}^m$
  • Project threats $\int_{0}^{u}$
  • Financial $\mathbb{Z}$

Ź

Midwest opportunities $\mathbb{Q}_+$

Location Map

PRECIOUS METALS AUSTRALIA EMITLED AND A

Wheimura Profect Description

  • $\rightarrow$ Magnetite mine (vanadiferous titano magnetite)
  • $\rightarrow$ 3.25 million tonnes ore pa
  • $\rightarrow$ Magnetite beneficiation plant
  • $\rightarrow$ 1.1 mtpa magnetite concentrate (Fe, Ti, V)
  • $\rightarrow$ Pyrometallurgical plant
  • $\rightarrow$ 1.1 mtpa roasted calcine (Fe, Ti, V)
  • $\rightarrow$ Hydromettalurgical plant
  • $\rightarrow$ 9,000 tpa vanadium trioxide powder
  • $\rightarrow$ Ferro alloys plant

Á,

$\rightarrow$ 6,200 tpa ferrovanadium 80

Windinuna History

  • 1985 Pegged by PMA
  • 1988 PMA floated on ASX
  • Drilling, testwork, research, process design 10 years ₩
  • 1998 J/V 49% PMA, 51% Xstrata $\mathcal{R}$
  • 1999 Construction

B

  • PMA reduce to 40%
  • 2000 Commissioning
  • PMA reduce to 15% NPI
  • 2003/4 Controversial closure
  • 2005 PMA regain 100% ownership
  • 2006/2007 Mine re-development/expansion

COTTESTERE

  • Partly dismantled $\mathcal{Q}_\mathcal{U}$
  • Insitu Plant replacement cost $\approx$ A\$100m ₩
  • Rotary kiln, Civils, concrete, Borefield, pit
  • Plus all infrastructure in place
  • 365km natural gas pipeline M
  • All weather roads
  • s46 Environmental approval
  • Aboriginal Clearances

6

  • Detailed engineering BFS near completion 90g
  • Cost to reopen, expand, value-add +A\$150m

Windhiurra Readevelopment Schedule

Re-engineering study (Mar '06)

  • Identified efficiency gains
  • Identified cost saving opportunities
  • Re-optimised of plant design
  • Bankable Feasibility Study (July '06)
  • Finalise and cost optimised design
  • Mine re-building $\approx$ 16 months 1.
    Ma
  • Production late 2007
  • Examining selling iron concentrate and Ti

Regional Geology

  • Current resource length approx 5,900 m
  • Strike length 27,000 m
  • 149m tonne resource
  • 1 billion tonne scope
  • Average width 200 metres
  • Mining weathered ore to 40m depth
  • Unweathered magnetite $+40$ m depth

PRECIOUS METALS AUSTRALIA HIMITED 2000 2000

Windimurra Reserve

A

Proven Reserve 50.4 mt $0.489\%$ V 2 O 5
Measured +
Indicated Resource
129.75 mt $0.46\%V_{2}O_{5}$
Inferred Resource 18 mt $0.4\%V, O5$
> Reserve Life 15.5 years
A Resource Life 45 years

JORC compliant Reserve included within Resource 15% of Strike tested

Typical Gross Section

WINDIMURRA VANADIUM MINE TYPICAL CROSS SECTION AT 8700mN

PRECIOUS METALS AUSTRALIA LIMITED

Whelmurra Plant

13

Windinuma Compatiwe Advantages

  • Largest proven reserve M
  • Only oxidised deposit in world 110)
    1100
  • Highly skilled labour 1977)
    Mar
  • Stable government and society (vs. Russia, China M and South Africa)
  • Natural gas for roasting H
  • Co product feedstocks from alumina and nickel H industries
  • Proven high quality production

Profect Threats

45

  • Volatile vanadium prices
  • need very high margin
  • Domestic gas supply squeezed for export
  • State royalty doesn't recognise down stream processing costs
  • Extreme labour shortages Milli
  • Spiraling construction costs
  • Lack of iron ore infrastructure
  • potential limited by lack of rail / port My

Firancial (2AS)

  • Total Capex \$275m
  • Existing plant \$100m
  • Cash at bank \$40m
  • Debt required $\sim $150$ m
  • Sales revenue-
  • At current prices \$275m pa
  • At 10 year average price \$150m
  • PMA Market Capitalisation \$150m

MIG WEST OPPORTUNITS - CONSULTATION SIROM

  • Light steel fabrication for tanks, stairways, hand rails, $\begin{picture}(20,20) \put(0,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0$ hoppers
  • Mechanical installation packages $\begin{picture}(20,20) \put(0,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0$
  • Water pipeline and borefield installation $\begin{picture}(20,20) \put(0,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0,1){30}} \put(15,0){\vector(0$
  • Crane hire (heavy lifting) 92.
  • Equipment hire 92)
    Mili
  • Supply camp for 140 persons $\frac{\partial p}{\partial x^2}$
  • Other site buildings 99.
    Ma
  • Labour hire opportunities 0.
    Ma
  • Civil works and concrete
  • Overhead power line construction

Mic West Opportunities - Ongoing S50mber vear

  • Support services (survey, catering, training, IT, vehicle maintenance & light fabrication)
  • Contract mining (earthmoving)
  • Heavy lifting 1.
    Ma
  • Bulk haulage of calcine/iron cons to Geraldton $\mathcal{H}$
  • Geraldton, Mt Magnet and other locally based employment

PRECIOUS METALS AUSTRALIA DIMITED

Vanadium Uses 1

  • Carbon steel Un
  • Reinforcing bars $\frac{\partial \mathcal{D}}{\partial \mathcal{D}}$
  • HSLA steel Un
  • Construction, pipelines, ships, autos
  • Tool steels Un
  • High-speed tools, wear resistant parts 徽

INDE

Titanium alloys

  • Jet engine parts, airframes, golf clubs, rockets, nuclear
  • Chemicals

24

  • Catalyst for sulphuric acid and plastics
  • Dietary, glasses, pigments Gilli
  • Batteries, new redox technology ₩

Use of Vanadium in Steel

  • The steel industry accounts for 85% of total V demand
  • Steel industry demand:
  • HSLA Steels (oil & gas pipelines) 33%
  • Carbon Steels (construction) 11%
  • Full Alloy Steels (forging applications) 24%
  • Tool Steels / Stainless Steel 17%

Vanadium / Hemum Alloys

  • Best strength to weight ratio of common engineering materials
  • Aircraft alloy was 5-7% of aircraft weight
  • Now 20% of aircraft weight
  • New alloy for A380 and B787 5-5-5 $(Al10\%$ Sn5% V5%

Vanadium Process Flow Diagram

WINDIMURRA VANADIUM MINE PROCESS FLOW