HMS DRILLING SUCCESS AT WEST MINE NORTH

KEY POINTS

  • Excellent infill drilling results confirm 3.5km high-grade HMS mineralised zone at West Mine North
  • The deposit is held under three granted mining leases - potential for near-term development
  • Drilling results follow Sheffield's acquisition of the West Mine North and Ellengail projects from Iluka and reinforce its strategy to develop multiple HMS projects in the North Perth Basin
  • Resource estimation underway and scoping studies on schedule to commence in October 2011

Bulk minerals explorer Sheffield Resources ("Sheffield") (ASX:SFX) today announced results from a 90 hole drilling program at its West Mine North heavy mineral sand (HMS) project 6km west of Eneabba in Western Australia's Mid West region (Figure 1).

Drilling results are shown in Tables 2 & 3; significant intersections include:

22.5m @ 6.87% HM from 16.5m (WMAC0077), 12m @ 8.2% HM from 18m (WMAC0064), 7.5m @ 10.9% HM from 24m (WMAC0071), and 15m @ 4.05% HM from 13.5m (WMAC0034).

The results confirm a zone of high grade mineralisation (>2.5% HM) approximately 3.5km long by 250m wide and up to 22m thick (Figure 2). The high-grade mineralisation is variably overlain and enveloped by a halo of lower grade (1-2% HM) mineralisation (Figure 3).

West Mine North is one of two advanced projects near Eneabba acquired by Sheffield from Iluka Resources Ltd earlier this year, the other being the Ellengail deposit, 3km to the north of West Mine North.

West Mine North is on granted Mining Leases and lies wholly within cleared freehold land. It is one of several projects within Sheffield's large tenement portfolio in the world class North Perth Basin mineral sands province.

Managing Director, Bruce McQuitty said the excellent drill results reinforce the Company's strategy to develop multiple HMS deposits in the Eneabba region of the North Perth Basin.

"Sheffield purchased West Mine North because of its potential for near-term development. The deposit is on granted Mining Leases and is an extension of the large high grade Eneabba West deposit that was mined by Iluka in the 1990s."

Iluka recently announced that it will resume mining activities at Eneabba and restart a Synthetic Rutile kiln in direct response to the supply constrained titanium dioxide and zircon markets.

West Mine North has a relatively high value mineral assemblage, comprising 5.6% zircon, 6.3% rutile, 54.3% ilmenite (at 60.7% TiO2) and 1.6% leucoxene, based on a total of 105 mineralogical analyses performed by Iluka. The high TiO2 content of the ilmenite indicates potential suitability as feed for chloride process or synthetic rutile production.

Sheffield will select representative composite samples from its recent drilling for additional mineral assemblage testwork. Resource estimation work is scheduled to begin in August.

Sheffield's ongoing resource estimation and scoping study schedule is provided in Table 1 below, and includes resource estimation work scheduled for the West Mine North and nearby Ellengail deposits.

Project Drilling status Assay timetable Resource Estimation Scoping Study
Yandanooka 130 holes completed Results received (see ASXrelease 16 May 2011) Commenced, resultsdue mid-August 2011 Commence October2011
Ellengail Compilation of historicdrilling completed Not applicable Commenced, resultsdue August 2011 Commence October2011
West MineNorth 90 holes completed Results received (see thisrelease) Commence August,results due September2011 Commence October2011
McCalls 30 holes completed Results due early August,2011 Commence August,results due October2011 Commence October2011
Irwin 31 holes completed Results due September,2011 N/A N/A
DrummondCrossing 30 holes completed Results due September2011 N/A N/A
Other projects Rig secured to drill newtargets in October/November 2011 N/A N/A N/A

Table 1Drilling and Resource Estimation Schedule

Note – these dates are indicative only and remain subject to possible delays arising from laboratory assay and other factors

ENDS

Website: www.sheffieldresources.com.au

For further information please contact: Bruce McQuitty Managing Director Tel: 0409 929 121 [email protected]

Media: Annette Ellis / Warrick Hazeldine Purple Communications Tel: 08 6314 6300 [email protected]

COMPETENT PERSONS' STATEMENT

The information in this announcement that relates to exploration results is based on information compiled by Bruce McQuitty. Mr McQuitty is a full time employee of the Company. Mr McQuitty is a Member of the Australasian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and the activity to which they are undertaking to qualify as Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves ("JORC Code")'. Mr McQuitty consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

FORWARD LOOKING AND EXPLORATION TARGET STATEMENTS

Some statements in this announcement regarding estimates or future events are forward-looking statements. They involve risk and uncertainties that could cause actual results to differ from estimated results. Forwardlooking statements include, but are not limited to, statements concerning the Company's exploration programme, outlook, target sizes and mineralised material estimates. They include statements preceded by words such as "expected", "planned", "target", "scheduled", "prospective", and similar expressions.

Figure 1: Location of West Mine North and Sheffield's other HMS Projects in the Eneabba Region

Figure 2: Location of drill holes and high grade mineralised zone at West Mine North

Figure 3: Typical drillhole sections through West Mine North (vertical exaggeration x2.5). Several sections were drilled to confirm grades and intervals in historic drilling, e.g. 6698250N Results of heavy liquid separation (HLS) are tabulated below. HLS using TBE, screen sizes: slimes -53um, oversize +1mm. Coordinates used throughout are MGA Zone 50 (GDA94).

Table 2: West Mine North aircore drill results. Intervals calculated using 2.5% HM cut, 6m minimum
width, maximum 1.5m internal waste.
Hole ID Easting Northing Depth From(m) Depth To(m) Interval Width(m) HMWt% SlimesWt% OsizeWt%
WMAC0021 326538 6699619 16.5 27.0 10.5 5.85 15.01 0.56
WMAC0024 326547 6699541 16.5 24.0 7.5 4.20 6.78 1.46
WMAC0027 326636 6699544 19.5 25.5 6.0 3.95 4.89 0.33
WMAC0034 326639 6699437 13.5 28.5 15.0 4.05 7.32 0.47
WMAC0035 326579 6699437 18.0 25.5 7.5 5.89 7.48 0.13
WMAC0036 326518 6699437 16.5 22.5 6.0 6.76 6.97 0.62
WMAC0044 326777 6699048 25.5 33.0 7.5 4.22 8.23 2.34
WMAC0045 326718 6699047 19.5 34.5 15.0 4.76 4.95 2.69
WMAC0052 326660 6698838 25.5 31.5 6.0 13.04 6.24 4.12
WMAC0053 326721 6698838 21.0 27.0 6.0 2.58 10.63 0.36
WMAC0054 326781 6698838 18.0 27.0 9.0 3.91 4.60 2.07
WMAC0059 326876 6698752 25.5 31.5 6.0 5.93 9.98 0.09
WMAC0060 326848 6698751 25.5 31.5 6.0 6.43 9.08 0.49
WMAC0061 326816 6698751 22.5 33.0 10.5 5.81 6.46 2.13
WMAC0064 326727 6698745 18.0 30.0 12.0 8.20 10.40 1.14
WMAC0070 326877 6698637 25.5 33.0 7.5 4.77 8.10 2.34
WMAC0071 326818 6698638 24.0 31.5 7.5 10.88 8.79 3.95
WMAC0072 326759 6698639 24.0 31.5 7.5 6.06 5.69 0.69
WMAC0076 327018 6698256 19.5 39.0 19.5 6.05 11.75 2.38
WMAC0077 326989 6698255 16.5 39.0 22.5 6.87 11.60 1.56
WMAC0078 326928 6698254 16.5 33.0 16.5 8.78 14.12 4.52
WMAC0079 326897 6698254 25.5 31.5 6.0 5.78 10.16 6.09
WMAC0081 326959 6698254 15.0 25.5 10.5 3.89 19.29 3.88
WMAC0083 327099 6697768 27.0 33.0 6.0 9.54 16.97 8.57
WMAC0084 327127 6697764 21.0 34.5 13.5 8.23 7.88 3.50
WMAC0086 327683 6697787 16.5 30.0 13.5 3.35 23.92 7.14
WMAC0088 327158 6697767 15.0 33.0 18.0 7.18 16.85 2.17
WMAC0089 327186 6697766 21.0 30.0 9.0 6.58 14.74 0.26
WMAC0090 327218 6697768 24.0 30.0 6.0 5.44 12.17 0.39

Table 3: West Mine North aircore drill results. Intervals calculated using 1.0% HM cut, 3m minimum width, maximum 1.5m internal waste.

Hole ID Easting Northing RL(AHD) HoleDepth DepthFrom(m) DepthTo(m) IntervalWidth(m) HMWt% SlimesWt% OsizeWt%
WMAC0001 326741 6700022 63 36 10.5 15.0 4.5 1.14 10.60 5.42
WMAC0002 326680 6700022 62 36 9.0 13.5 4.5 1.10 16.35 5.52
WMAC0002 326680 6700022 62 36 19.5 30.0 10.5 1.22 6.79 0.56
WMAC0003 326621 6700020 61 36 7.5 13.5 6.0 1.10 8.04 9.41
WMAC0003 326621 6700020 61 36 19.5 34.5 15.0 1.77 5.50 14.27
WMAC0004 326560 6700017 61 36 7.5 13.5 6.0 1.24 7.85 3.81
WMAC0004 326560 6700017 61 36 18.0 25.5 7.5 2.63 2.33 0.08
WMAC0005 326505 6700038 60 36 9.0 12.0 3.0 1.29 12.81 2.44
WMAC0005 326505 6700038 60 36 15.0 24.0 9.0 2.40 2.58 0.20
WMAC0006 326400 6700230 63 36 21.0 31.5 10.5 3.38 17.17 1.77
WMAC0007 326328 6700241 62 36 No Significant Result
WMAC0008 326256 6700253 61 36 19.5 24.0 4.5 1.28 23.57 0.31
WMAC0008 326256 6700253 61 36 28.5 36.0 7.5 1.81 27.21 8.16
WMAC0009 326191 6700263 60 36 15.0 18.0 3.0 1.39 19.69 1.50
WMAC0009 326191 6700263 60 36 25.5 33.0 7.5 1.56 15.57 2.59
WMAC0010 326439 6699839 60 36 7.5 15.0 7.5 1.06 10.48 1.65
WMAC0011 326499 6699839 59 36 7.5 24.0 16.5 2.09 6.79 0.80
WMAC0012 326558 6699839 60 36 4.5 13.5 9.0 1.29 17.48 3.33
WMAC0012 326558 6699839 60 36 16.5 24.0 7.5 1.70 2.88 0.47
WMAC0013 326445 6700040 60 36 12.0 24.0 12.0 3.13 9.24 1.38
WMAC0014 326619 6699839 60 36 7.5 15.0 7.5 1.43 13.38 1.80
WMAC0014 326619 6699839 60 36 18.0 22.5 4.5 2.13 3.47 0.07
WMAC0014 326619 6699839 60 36 28.5 31.5 3.0 5.74 6.02 12.70
WMAC0015 326679 6699839 61 36 6.0 15.0 9.0 1.41 17.16 4.02
WMAC0015 326679 6699839 61 36 24.0 34.5 10.5 1.61 7.91 9.26
WMAC0016 326740 6699839 61 24 12.0 15.0 3.0 1.07 17.05 5.36
WMAC0017 326778 6699621 63 36 7.5 19.5 12.0 1.74 5.13 1.73
WMAC0017 326778 6699621 63 36 30.0 36.0 6.0 1.43 4.85 9.90
WMAC0018 326718 6699620 63 30 7.5 30.0 22.5 1.80 7.19 2.94
WMAC0019 326659 6699620 62 39 6.0 28.5 22.5 1.96 8.74 1.87
WMAC0020 326599 6699620 61 39 4.5 25.5 21.0 1.99 13.99 2.16
WMAC0021 326538 6699619 60 39 4.5 27.0 22.5 3.61 19.39 1.92
WMAC0022 326478 6699619 60 39 4.5 18.0 13.5 1.15 19.20 3.43
WMAC0022 326478 6699619 60 39 24.0 28.5 4.5 1.61 3.22 1.78
WMAC0023 326419 6699618 59 39 9.0 22.5 13.5 1.13 16.25 1.07
WMAC0023 326419 6699618 59 39 25.5 30.0 4.5 2.52 3.39 2.26
WMAC0024 326547 6699541 61 42 4.5 25.5 21.0 2.40 10.35 4.69
WMAC0025 326578 6699543 61 42 6.0 27.0 21.0 1.70 12.28 3.23
WMAC0026 326607 6699544 61 42 6.0 25.5 19.5 1.86 15.45 3.69
WMAC0027 326636 6699544 61 42 9.0 27.0 18.0 2.27 14.91 2.41
WMAC0028 326669 6699545 62 42 9.0 12.0 3.0 1.23 24.73 8.37
WMAC0028 326669 6699545 62 42 15.0 18.0 3.0 1.22 18.74 3.15
WMAC0028 326669 6699545 62 42 22.5 28.5 6.0 4.41 6.63 0.17
- 8 -
Hole ID Easting Northing RL(AHD) HoleDepth DepthFrom(m) DepthTo(m) IntervalWidth(m) HMWt% SlimesWt% OsizeWt%
WMAC0029 327499 6699437 66 33 No Significant Result
WMAC0030 327439 6699437 66 33 7.5 19.5 12.0 1.56 26.72 4.54
WMAC0031 327380 6699436 66 33 No Significant Result
WMAC0032 326759 6699438 62 33 9.0 13.5 4.5 1.17 24.64 4.88
WMAC0032 326759 6699438 62 33 16.5 25.5 9.0 1.35 11.38 0.67
WMAC0033 326699 6699437 62 42 6.0 28.5 22.5 1.97 16.18 4.13
WMAC0034 326639 6699437 62 42 6.0 28.5 22.5 3.30 7.98 1.26
WMAC0035 326579 6699437 60 42 4.5 28.5 24.0 2.99 11.13 1.00
WMAC0036 326518 6699437 60 42 1.5 28.5 27.0 2.83 7.34 2.13
WMAC0037 326459 6699438 60 42 3.0 22.5 19.5 1.67 9.70 2.57
WMAC0037 326459 6699438 60 42 25.5 34.5 9.0 10.35 6.94 1.70
WMAC0038 326399 6699439 60 42 4.5 24.0 19.5 1.82 11.07 2.73
WMAC0038 326399 6699439 60 42 30.0 37.5 7.5 1.25 20.31 20.13
WMAC0039 326819 6699236 62 42 21.0 27.0 6.0 1.04 10.75 0.39
WMAC0040 326759 6699236 62 42 19.5 33.0 13.5 1.27 15.40 0.69
WMAC0041 326695 6699237 62 26 16.5 24.0 7.5 1.59 12.08 1.79
WMAC0042 326895 6699049 62 42 18.0 21.0 3.0 1.18 15.11 0.51
WMAC0043 326836 6699049 62 42 27.0 30.0 3.0 1.27 12.21 1.52
WMAC0044 326777 6699048 62 42 19.5 40.5 21.0 2.23 7.74 4.85
WMAC0045 326718 6699047 61 35 9.0 34.5 25.5 3.43 12.42 3.93
WMAC0046 326656 6699047 61 42 15.0 31.5 16.5 1.78 11.64 2.74
WMAC0047 326597 6699045 60 42 7.5 22.5 15.0 1.41 22.77 1.60
WMAC0047 326597 6699045 60 42 25.5 36.0 10.5 3.45 12.98 3.88
WMAC0048 326538 6699045 60 42 7.5 21.0 13.5 1.47 23.07 3.14
WMAC0048 326538 6699045 60 42 31.5 34.5 3.0 8.12 10.55 7.90
WMAC0049 326477 6699044 60 39 31.5 34.5 3.0 1.15 8.44 14.01
WMAC0050 326541 6698838 60 42 No Significant Result
WMAC0051 326601 6698838 60 39 7.5 10.5 3.0 1.12 27.39 2.36
WMAC0051 326601 6698838 60 39 30.0 37.5 7.5 1.69 5.88 19.49
WMAC0052 326660 6698838 61 39 16.5 37.5 21.0 4.96 7.84 9.70
WMAC0053 326721 6698838 61 39 7.5 12.0 4.5 1.38 25.46 5.07
WMAC0053 326721 6698838 61 39 15.0 33.0 18.0 2.15 10.02 4.29
WMAC0054 326781 6698838 61 27 9.0 27.0 18.0 2.64 10.76 4.54
WMAC0055 326841 6698838 62 39 9.0 31.5 22.5 2.03 15.36 3.02
WMAC0056 326900 6698838 62 39 24.0 31.5 7.5 1.40 8.19 0.55
WMAC0057 326960 6698838 63 39 27.0 30.0 3.0 1.92 11.18 1.22
WMAC0058 327019 6698838 63 39 18.0 30.0 12.0 1.56 12.89 1.01
WMAC0059 326876 6698752 62 39 18.0 34.5 16.5 3.07 12.90 3.44
WMAC0060 326848 6698751 62 39 16.5 31.5 15.0 3.52 13.61 0.36
WMAC0060 326848 6698751 62 39 34.5 39.0 4.5 1.66 5.43 3.51
WMAC0061 326816 6698751 61 39 18.0 39.0 21.0 3.80 11.98 3.25
WMAC0062 326788 6698748 61 27 13.5 27.0 13.5 2.20 6.00 2.30
WMAC0063 326758 6698747 61 29 10.5 28.5 18.0 2.71 9.74 3.88
WMAC0064 326727 6698745 61 33 9.0 31.5 22.5 4.94 14.32 5.02
WMAC0065 326698 6698744 62 39 19.5 36.0 16.5 5.76 10.10 5.23
Hole ID Easting Northing RL(AHD) HoleDepth DepthFrom(m) DepthTo(m) IntervalWidth(m) HMWt% SlimesWt% OsizeWt%
WMAC0066 326668 6698744 62 39 9.0 12.0 3.0 1.12 29.16 6.16
WMAC0066 326668 6698744 62 39 25.5 36.0 10.5 2.61 3.49 10.24
WMAC0067 327056 6698640 62 39 10.5 13.5 3.0 1.12 20.02 2.89
WMAC0068 326999 6698639 62 39 10.5 13.5 3.0 1.18 21.38 3.80
WMAC0068 326999 6698639 62 39 25.5 37.5 12.0 1.38 10.08 1.49
WMAC0069 326940 6698638 61 39 18.0 30.0 12.0 2.08 12.52 0.48
WMAC0070 326877 6698637 62 39 16.5 36.0 19.5 2.62 11.61 3.47
WMAC0071 326818 6698638 62 32 16.5 31.5 15.0 6.80 15.08 5.44
WMAC0072 326759 6698639 61 39 6.0 10.5 4.5 1.14 14.79 13.69
WMAC0072 326759 6698639 61 39 19.5 37.5 18.0 3.38 8.13 6.86
WMAC0073 326697 6698637 59 39 6.0 9.0 3.0 1.17 18.69 9.71
WMAC0073 326697 6698637 59 39 28.5 39.0 10.5 1.96 6.84 16.01
WMAC0074 326639 6698639 58 39 6.0 9.0 3.0 1.08 28.51 5.06
WMAC0074 326639 6698639 58 39 28.5 33.0 4.5 1.19 4.97 16.98
WMAC0075 327047 6698257 61 39 9.0 12.0 3.0 1.16 19.92 4.48
WMAC0075 327047 6698257 61 39 15.0 34.5 19.5 1.80 15.49 1.82
WMAC0076 327018 6698256 61 39 7.5 39.0 31.5 4.33 14.80 4.01
WMAC0077 326989 6698255 61 39 7.5 39.0 31.5 5.30 13.87 3.64
WMAC0078 326928 6698254 61 39 10.5 34.5 24.0 6.44 14.70 7.82
WMAC0079 326897 6698254 61 39 9.0 12.0 3.0 1.26 23.30 1.96
WMAC0079 326897 6698254 61 39 16.5 37.5 21.0 2.61 12.78 6.84
WMAC0080 326867 6698252 60 39 15.0 39.0 24.0 2.33 12.69 6.88
WMAC0081 326959 6698254 61 26 9.0 25.5 16.5 3.04 19.61 5.49
WMAC0082 327070 6697762 60 39 28.5 31.5 3.0 2.30 12.47 4.23
WMAC0083 327099 6697768 61 39 15.0 36.0 21.0 3.60 15.63 4.80
WMAC0084 327127 6697764 61 39 13.5 39.0 25.5 5.06 11.90 3.28
WMAC0085 327636 6697781 63 39 10.5 25.5 15.0 1.36 16.47 3.59
WMAC0086 327683 6697787 63 39 15.0 30.0 15.0 3.20 22.41 7.19
WMAC0087 327735 6697790 62 39 15.0 22.5 7.5 2.76 36.23 7.94
WMAC0087 327735 6697790 62 39 31.5 39.0 7.5 1.22 26.50 24.41
WMAC0088 327158 6697767 61 39 10.5 34.5 24.0 5.64 16.22 3.96
WMAC0089 327186 6697766 61 39 15.0 36.0 21.0 3.69 15.31 3.24
WMAC0090 327218 6697768 62 39 16.5 33.0 16.5 3.03 12.37 1.33

ABOUT SHEFFIELD RESOURCES

Sheffield Resources Limited (Sheffield) is a new exploration company with a bulk minerals focus. The Company's Projects are geared towards the steel industry feed cycle (iron ore and tungsten) and the emerging fillers-ceramics-pigments cycle (talc, zircon, titanium dioxide).

ASX Code – Market Cap @ 26cps -
SFX $15.3m
Issued shares –58.7m Cash -$4.1(approx.)

The Company has over 6,000km2 of highly prospective tenure, all situated in Western Australia.

HEAVY MINERAL SANDS

Sheffield controls over 5,000km2 of mineral sands tenure in the established North Perth Basin mineral sands province and the emerging Carnarvon, Eucla and Canning Basin provinces.

Sheffield's North Perth Basin tenement package of over 2,500km2 contains seven advanced exploration projects: West Mine North, Ellengail, Yandanooka, Durack, Beekeepers, and Irwin which are located near Eneabba and the large McCalls deposit - a former BHP project located near Gingin. These projects are well located close to existing mineral sands operations and to a network of highways and railway lines connecting to Geraldton and Fremantle/Kwinana ports. Sheffield's strategy is, subject to exploration success, to build multiple HMS projects capable of supporting a flexible mobile mining plant.

TALC

Sheffield has 1,152km2 of tenure over the 175km-long Moora Talc Belt which represents a dominant ground position over a region that has, for the last 50 years, been exclusively controlled by major mining companies.

The Moora Talc Belt includes the large Three Springs mine which is owned by Rio Tinto Limited subsidiary Luzenac Australia Pty Ltd. Three Springs is renowned for producing high purity talc and is a relatively simple "dig-and-deliver" operation.

The existing infrastructure is excellent. A railway and a sealed highway transect the project and connect to Geraldton port approximately 170km to the northwest.

Sheffield's large tenement holding contains numerous talc occurrences and has the potential to become a strategic talc asset. Sheffield therefore represents a unique opportunity for investors to gain exposure to one of the few high-grade talc explorers in the world.

IRON

Sheffield's Pilbara iron ore projects consist of five granted tenements and 7 tenement applications, five of which are subject to ballot with multiple competing parties. Sheffield's strategy is to target hematite mineralisation adjacent to infrastructure in the world class Pilbara iron province and to build up consolidated tenement holdings over time. High grade iron mineralisation has been identified on three of the Company's tenements.