Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Sheffield Resources Ltd. Capital/Financing Update 2011

Sep 6, 2011

44780_rns_2011-09-06_f323183b-7898-4112-9462-6d46d2e8c598.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX and Media Release

7 September 2011

NEW LICENCE GRANTED OVER HIGH GRADE ZIRCON PROJECT

KEY POINTS

  • Exploration licence granted over large scale Dampier heavy mineral sands project
  • Former Rio Tinto exploration project, relinquished during the global financial crisis and before recent escalation in HM commodity prices
  • Prior drilling has identified high grade zircon mineralisation (8.07% HM, 8.0% zircon in assemblage for a 0.65% in situ zircon grade) within a 15km strike length target zone
  • Sheffield to undertake Aboriginal Heritage Surveys ahead of resource drilling

Bulk minerals explorer Sheffield Resources ("Sheffield") (ASX:SFX) today announced the grant of a key tenement covering its Dampier mineral sands project near Derby in the Kimberley region of Western Australia (see Figure 1).

Exploration licence E04/2083, is located approximately 60km west of the expanding port of Derby and lies outside the recently proclaimed Kimberley National Heritage Estate listed area. Together with 3 adjacent tenements under application, the Dampier project covers 1,314 km2 of prospective mineral sands ground.

The Dampier project area was explored by Rio Tinto ("Rio") between 2004 and 2009. Rio completed four broadly spaced aircore drill traverses, identifying two zones of significant heavy mineral concentration: a large, shallow "eastern zone", named Thunderbird, and a smaller, deeper "western zone", named Argo (see Figures 2-4). Selected intersections from each prospect are listed below (refer to Tables 1 & 2 for further details):

Thunderbird 45m @ 9.85% HM from 3m (JD073),27m @ 7.00% HM from 1.5m (JD023),and27m @ 7.92% HM from 9m (JD003).
Argo 12m @ 3.49% HM from 42m (JD036),and7.5m @ 3.44% HM from 27m (JD037)

Significantly, the mineral assemblage includes zircon grades of up to 11.4%.

Managing Director, Bruce McQuitty said the Dampier project represents a large scale mineral sands play with excellent heavy mineral grades and potentially high value heavy mineral assemblages.

"The Dampier project has significant size, scale and grade potential and is a key addition to Sheffield"s mineral sands project portfolio which already includes the large McCalls project and smaller projects with near-term development potential in the North Perth Basin."

The heavy mineral concentrations are hosted by shallowly-dipping and deeply weathered sand units of the Jowlaenga Formation which occurs stratigraphically below the Broome Sandstone and its locally silcreted equivalent, the Melligo Quartzite. Sizing analysis indicates that the heavy mineral is fine-grained and typical of large shallow offshore mineral sand deposits.

The fine grained nature of the mineralisation and variable iron cementation and hardness may present some metallurgical challenges (lower recoveries) however these are offset by the high heavy mineral grade and the potentially high value zircon, rutile and leucoxene-rich mineral assemblage.

Thunderbird

At Thunderbird, high grade mineralisation averages over 24m thickness and has been identified on two lines of drilling over a strike length of 6.5km. The mineralisation extends down dip for up to 5km, at which point the top of the HM accumulation sits at just 30m depth. A deeper leucoxenerich western extension to the Thunderbird mineralisation is referred to as the Stingray prospect. A third drill line, located to the southeast of Thunderbird, intersected lower grade mineralization (e.g. JD013: 28.5m @ 2.61 % HM from 1.5m depth) which could extend the strike length to 11.5km. A large thorium radiometric anomaly, thought to be sourced from the rare earth-bearing monazite and xenotime component in the heavy mineral concentrations, indicates exploration potential for up to 15km of strike length (Figure 2).

The Thunderbird prospect averages 8.07% HM and 16.1% fines (<45μ). The mineral assemblage averages 8.0% zircon, 2.3% rutile, 6.7% leucoxene, 17.8% altered ilmenite, and 16.5%

ilmenite, based on the average of 63 samples analysed by SEM probing at the Rio Tinto facility in the United Kingdom in 2006 and 65 samples analysed by the CSIRO in Perth during 2008 using the AutoGeoSEM method. The high average heavy mineral grade (8.07%) and the moderately high average zircon assemblage (8.0%) equate to an average in situ zircon grade of 0.65%*.

Rio undertook mineral characterisation test work in 2007 on a single bulk sample of 300kg collected from drill holes that twinned the JD003 intersection. The work indicated that 24-39% of the total HM is iron oxide aggregates with the remainder being mostly ilmenite, altered ilmenite, low titanium ilmenite, leucoxene, rutile and zircon. Calculated mineralogy of float-sink fractions from the 300kg bulk sample indicated a head mineral assemblage of 11.5% zircon. Rio concluded that although iron oxide aggregates represent a significant proportion of the heavy mineral assemblage, the amount of zircon, rutile, leucoxene and altered ilmenite was sufficient to encourage additional exploration.

Figure 2: Plan of mineralised zones at Dampier showing location of Rio Tinto drill holes

Figure 3: Thunderbird Prospect – Cross Section A-A'

Figure 4: Argo Prospect – Cross Section B-B'

Argo

At Argo, mineralisation between 6 to 12m thick has been intersected in four drill holes and extends down-dip over a distance of 2km along a north-south drill line. The depth of the heavy mineral zone ranges from 27 to 54m. The mineralisation dips to the south at 0.8 degrees and is open along strike to the northwest, southeast and up-dip.

The heavy mineral horizon averages 3.1% HM and 6.9% fines (<45μ) with the mineral assemblage consisting of 7.4% zircon, 5.9% rutile, 56.4% leucoxene, 4.5% altered iImenite and 0.1% ilmenite (based on the average of 20 samples analysed by the CSIRO in Perth during 2008 using the AutoGeoSEM method).

Rio undertook metallurgical test work in 2007 using conventional processing methods on a 420kg bulk sand sample from Argo. The work focused on the quality of the zircon which was found to be within the acceptable 500 U+Th range if 10% of the zircon is removed magnetically. The heavy mineral concentrate product after gravity upgrading contained 11.6% ZrO2, which translates to a zircon content of 17.3%. This does not reconcile with the 7.2% zircon content shown by SEM mineralogy over the 9m of the high grade interval within the bulk sample interval. Bulk samples from both deposits returned substantially higher zircon grades than the average of the SEM test work. Sheffield plans to undertake further mineral assemblage test work on both deposits to provide more accurate mineral assemblage data.

Figure 5: Rougher stage (left) and Cleaner stage (right) gravity separation of HM undertaken by Mineral Technologies Pty Ltd on bulk sample from the Argo prospect. Source: Combined Annual Report (C96/2003 Mt Jowlaenga) for the Period 21 July 2007 to 20 July 2008 Rio Tinto Exploration Pty Ltd.

Exploration potential and further work

The Thunderbird prospect is located within a 15km by 6km coincident geochemical, drill hole and thorium radiometric anomaly. This target has been tested by only four lines of drilling. The mineralisation remains open in all directions. The Argo prospect is concealed by shallow aeolian sand and has been traversed by a single line of aircore holes. The mineralisation is open along strike in both directions.

Sheffield intends to complete Aboriginal Heritage Surveys over the project as soon as possible, ahead of an aircore drilling programme of sufficient density to enable estimation of an inferred resource and to provide representative samples for metallurgical work. Due to the impending onset of the wet season it may not be possible to complete this drilling until May 2012.

The Company has agreed to issue 250,000 options (exercise price of 44c, expiry 3 years) to a consultant in consideration for identifying this opportunity for the Company.

ENDS

Website: www.sheffieldresources.com.au

For further information please contact: Bruce McQuitty Managing Director Tel: 0409 929 121 [email protected]

Media: Annette Ellis / Warrick Hazeldine Purple Communications Tel: 08 6314 6300 [email protected]

COMPETENT PERSONS' STATEMENT

The information in this announcement that relates to exploration results is based on information compiled by Bruce McQuitty. Mr McQuitty is a full time employee of the Company. Mr McQuitty is a Member of the Australasian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and the activity to which they are undertaking to qualify as Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves ("JORC Code")". Mr McQuitty consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

FORWARD LOOKING AND EXPLORATION TARGET STATEMENTS

Some statements in this announcement regarding estimates or future events are forward-looking statements. They involve risk and uncertainties that could cause actual results to differ from estimated results. Forwardlooking statements include, but are not limited to, statements concerning the Company"s exploration programme, outlook, target sizes and mineralised material estimates. They include statements preceded by words such as "expected", "planned", "target", "scheduled", "prospective", and similar expressions.

Table 1: Rio Tinto drill hole intersections >3m @ >2% HM

THUNDERBIRD
Hole ID Easting Northing DepthFrom (m) DepthTo (m) IntervalWidth (m) HM % Slimes %
JD001 497290 8073408 4.5 28.5 24.0 5.30 17.51
JD002 497129 8072357 1.5 30.0 28.5 5.56 17.46
JD003 496974 8071252 9.0 36.0* 27.0 7.92 18.81
JD004 496801 8070081 18.0 36.0* 18.0 7.26 14.38
JD023 496758 8073388 1.5 28.5 27.0 7.00 17.48
JD025 495707 8073332 3.0 15.0* 12.0 13.23 12.65
JD072 494586 8073276 19.5 37.5* 18.0 8.49 15.03
JD073 495703 8073335 3.0 48.0 45.0 9.85 15.67
Average 24.9 8.07 16.12

THUNDERBIRD LOW GRADE HALO

JD005 496607 8068745 30.0 45.0* 15.0 2.25 7.54
JD013 502145 8067066 1.5 30.0 28.5 2.61 21.91
Average 21.8 2.43 14.73

STINGRAY

JD067 490505 8073004 75.0 81.0 6.0 4.54 13.83
JD069 492491 8073159 45.0 51.0* 6.0 4.49 10.75
JD070 493546 8073212 34.5 37.5 3.0 3.47 9.51
JD070 493546 8073212 48.0 51.0* 3.0 2.93 8.44
Average 4.5 3.86 10.63

ARGO

JD036 483042 8068131 42.0 54.0 12.0 3.49 6.97
JD037 483055 8069009 27.0 34.5 7.5 3.44 6.45
JD056 483027 8067671 54.0 60.0 6.0 2.61 7.09
JD057 483086 8068655 30.0 37.5 7.5 2.86 7.02
Average 8.3 3.10 6.88

Intersections calculated using a 2% HM lower cut, a minimum interval of 3m and allowing 1.5m internal dilution. * denotes drill hole terminated in mineralisation.

Table 2: Drill hole intersections >3m @ >2% HM – mineral assemblages

THUNDERBIRD
Hole ID DepthFrom (m) DepthTo (m) IntervalWidth (m) Zircon Rutile Leucoxene AlteredIlmenite Ilmenite
JD001 4.5 28.5 24.0 10.5 2.5 4.8 11.7 31.2
JD002 1.5 30.0 28.5 9.4 2.9 4.9 13.3 27.1
JD003 9.0 36.0* 27.0 11.4 3.0 6.5 14.1 31.9
JD004 18.0 36.0* 18.0 8.9 2.8 5.7 23.7 26.5
JD023 1.5 28.5 27.0 7.1 1.8 3.7 20.5 5.8
JD025 3.0 15.0* 12.0 4.8 2.2 12.5 19.6 2.2
JD072 19.5 37.5* 18.0 6.2 1.9 10.7 24.0 2.1
JD073 3.0 48.0 45.0 5.5 1.6 4.9 15.4 5.2
Average 24.9 8.0 2.3 6.7 17.8 16.5
THUNDERBIRD LOW GRADE HALO
JD005 30.0 45.0* 15.0 6.7 3.0 8.1 29.9 12.1
JD013 1.5 30.0 28.5 8.9 2.7 6.4 21.2 20.2
Average 21.8 7.8 2.9 7.2 25.5 16.2
STINGRAY
JD067 75.0 81.0 6.0 6.0 4.7 44.3 21.0 0.5
JD069 45.0 51.0* 6.0 NA NA NA NA NA
JD070 34.5 37.5 3.0 9.8 3.1 45.1 10.2 0.6
JD070 48.0 51.0* 3.0 NA NA NA NA NA
Average 4.5 7.9 3.9 44.7 15.6 0.6
ARGO
JD036 42.0 54.0 12.0 5.9 3.5 41.1 6.1 0.4
JD037 27.0 34.5 7.5 8.0 8.7 57.0 2.1 0.0
JD056 54.0 60.0 6.0 7.7 5.4 60.8 6.6 0.1
JD057 30.0 37.5 7.5 7.9 6.0 66.5 3.1 0.0
Average 8.3 7.4 5.9 56.4 4.5 0.1

Intersections calculated using a 2% HM lower cut, a minimum interval of 3m and allowing 1.5m internal dilution. NA = not analysed. * denotes drill hole terminated in mineralisation.

ABOUT SHEFFIELD RESOURCES

Sheffield Resources Limited (Sheffield) is a new exploration company with a bulk minerals focus. The Company"s Projects are geared towards the steel industry feed cycle (iron ore and tungsten) and the emerging fillers-ceramics-pigments cycle (talc, zircon, titanium dioxide).

ASX Code – Market Cap @ 27cps -
SFX $15.8m
Issued shares –58.7m Cash -$4.1(at 30/6/2011)

The Company has over 6,000km2 of highly prospective tenure, all situated in Western Australia.

HEAVY MINERAL SANDS

Sheffield controls over 5,000km2 of mineral sands tenure in the established North Perth Basin mineral sands province and the emerging Carnarvon, Eucla and Canning Basin provinces.

The Dampier project, located near Derby in WA"s Kimberley region is the most recent addition to Sheffield"s heavy mineral sands project portfolio, Dampier is a large scale zircon play formerly explored by Rio Tinto.

Sheffield"s North Perth Basin tenement package of over 2,500km2 contains seven advanced exploration projects: West Mine North, Ellengail, Yandanooka, Durack, Beekeepers, and Irwin which are located near Eneabba and the large McCalls deposit - a former BHP project located near Gingin. These projects are well located close to existing mineral sands operations and to a network of highways and railway lines connecting to Geraldton and Fremantle/Kwinana ports. Sheffield"s strategy is, subject to exploration success, to build multiple HMS projects capable of supporting a flexible mobile mining plant.

TALC

Sheffield has 1,152km2 of tenure over the 175km-long Moora Talc Belt which represents a dominant ground position over a region that has, for the last 50 years, been exclusively controlled by major mining companies.

The Moora Talc Belt includes the large Three Springs mine which is owned by Rio Tinto Limited subsidiary Luzenac Australia Pty Ltd. Three Springs is renowned for producing high purity talc and is a relatively simple "dig-and-deliver" operation.

The existing infrastructure is excellent. A railway and a sealed highway transect the project and connect to Geraldton port approximately 170km to the northwest.

Sheffield"s large tenement holding contains numerous talc occurrences and has the potential to become a strategic talc asset. Sheffield therefore represents a unique opportunity for investors to gain exposure to one of the few high-grade talc explorers in the world.

IRON

Sheffield"s Pilbara iron ore projects consist of five granted tenements and 7 tenement applications, five of which are subject to ballot with multiple competing parties. Sheffield"s strategy is to target hematite mineralisation adjacent to infrastructure in the world class Pilbara iron province and to build up consolidated tenement holdings over time. High grade iron mineralisation has been identified on three of the Company"s tenements.