AI assistant
LCL RESOURCES LIMITED — Capital/Financing Update 2015
Apr 6, 2015
65217_rns_2015-04-06_9e375e8e-0af8-470e-b2af-98b803bcc5e6.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
ASX ANNOUNCEMENT
7 April 2015
==> picture [217 x 36] intentionally omitted <==
RIGHTS ISSUE – RECORD DATE
Metminco Limited (“Metminco”) advises that there was an inconsistency between the Record Date of the Rights Issue as disclosed in the ASX Announcement dated 1 April 2015 (“Announcement”) and the Record Date as disclosed in the Rights Issue Prospectus attached to that Announcement.
The Record Date is 10 April 2015 as disclosed in the Rights Issue Prospectus. The Record Date disclosed in the Announcement was incorrect.
Your sincerely,
==> picture [104 x 51] intentionally omitted <==
Philip W Killen
Company Secretary
For further information contact:
METMINCO LIMITED
Stephen Tainton / Phil Killen Office: +61 (0) 2 9460 1856
NOMINATED ADVISOR AND BROKER
RFC Ambrian
Australia Will Souter/ Nathan Forsyth Office: +61 (0) 2 9250 0000 United Kingdom Samantha Harrison / John van Eeghen Office: +44 (0) 20 3440 6800 PUBLIC RELATIONS Buchanan (UK) Gordon Poole/Bobby Morse Office: +44 (0) 207 466 5000
Metminco Limited ABN 43 119 759 349 Level 6, 122 Walker Street, North Sydney, NSW, 2060 ASX Code: MNC.AX; AIM Code: MNC.L Tel: +61 (0) 2 9460 1856; Fax: +61 (0) 2 9460 1857 www.metminco.com.au
ASX ANNOUNCEMENT
METMINCO LIMITED
7 April 2015
Company Background
Metminco is a dual ASX and AIM listed company with a portfolio of copper, molybdenum and gold projects in Peru and Chile.
Projects and Mineral Resources
The Los Calatos Project, located in southern Peru, has an open pittable Mineral Resource of 493 million tonnes at 0.38% Cu and 0.023% Mo (at cut-off grade of 0.15% CuEq) to a vertical depth of 700 metres below surface and an underground bulk mining Mineral Resource of 926 million tonnes at 0.51% Cu and 0.022% Mo (at a cut-off grade of 0.35% CuEq) commencing at an elevation of 2,300 metres (approximately 700 metres below surface).
The Chilean assets include the Mollacas Copper Project with a Mineral Resource of 15.5 million tonnes consisting of a Measured Resource of 11.2 million tonnes at 0.55% Cu and 0.12g/t Au and an Indicated Resource of 4.3 million tonnes at 0.41% Cu and 0.14g/t Au(at a 0.2% copper cut-off); and the Vallecillo Project with a Mineral Resource of 8.9 million tonnes consisting of a Measured Resource of 5.5 million tonnes at 0.84g/t Au, 9.99g/t Ag, 1.12% Zn and 0.32% Pb, an Indicated Resource of 2.6 million tonnes at 0.80g/t Au, 10.23g/t Ag, 0.94% Zn and 0.35% Pb and an Inferred Resource of 0.8 million tonnes at 0.50g/t Au, 8.62g/t Ag, 0.48% Zn and 0.17% Pb (at a cut-off grade of 0.2g/t Au).
The Company also has a number of early stage exploration projects where initial exploration activities have identified anomalous copper, molybdenum and gold values.
Competent Persons Statement
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Colin Sinclair, BSc, MSc, who is a Member of the Australasian Institute of Mining and Metallurgy and is currently employed by the Company in Chile.
Colin Sinclair has sufficient experience (over 30 years) which is relevant to the style of mineralisation, type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results’. Mr Sinclair, as Competent Person for this announcement, has consented to the inclusion of the information in the form and context in which it appears herein.
Forward Looking Statement
All statements other than statements of historical fact included in this announcement including, without limitation, statements regarding future plans and objectives of Metminco are forward-looking statements. When used in this announcement, forward-looking statements can be identified by words such as ‘’anticipate”, “believe”, “could”, “estimate”, “expect”, “future”, “intend”, “may”, “opportunity”, “plan”, “potential”, “project”, “seek”, “will” and other similar words that involve risks and uncertainties.
These statements are based on an assessment of present economic and operating conditions, and on a number of assumptions regarding future events and actions that, as at the date of this announcement, are expected to take place. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company, its directors and management of Metminco that could cause Metminco’s actual results to differ materially from the results expressed or anticipated in these statements.
The Company cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this announcement will actually occur and investors are cautioned not to place undue reliance on these forward-looking statements. Metminco does not undertake to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this announcement, except where required by applicable law and stock exchange listing requirements.